Bridgnorth signal box

Revision as of 16:35, 6 November 2015 by Robin (talk | contribs) (add links)
Bridgnorth Signal Box
Interior of Bridgnorth Signal Box
The pre-preservation signal box, photographed in September 1962 (Sellick Collection)

A signal box at Bridgnorth that works to Hampton Loade (short section) or Highley (long section) using ETT regulations.

Bridgnorth has had a number of signal boxes during its existence. Initially construction of two boxes was authorised in 1891 and these were brought into use in October 1892. Bridgnorth North signal box was situated north of the station on the Down side, where the two lines converged into the single line. Bridgnorth South Signal Box was at the south end of the station on the Up side, opposite Pan Pudding Hill where it could control access to the goods yard[1]. A photo of the latter box circa 1900 appears in SVR news edition 44. In 1923 both boxes were replaced by a single central signal box[2]. This was closed by BR on 2 December 1963, and the upper structure was demolished in 1965 just before the arrival of the SVR Society[3].

The masonary base of the former central signal box was originally slightly longer than it is today. Evidence of this truncation may be found by inspection of the brickwork towards the northern end on the front wall. The upper timber section was replaced by an ill-fitting box originally built in 1925 which was relocated from Pensnett in December 1968 and erected during the following year. Much of the frame, interlocking and instruments were taken from Arley signal box, which would later require that box in turn to be re-equipped when the SVR extended southwards[4].

The signal box suffered a fire on the night of 1 January 1977. This initially started in the mains electricity switch-gear under the staircase; the staircase and surrounding floorboards were well alight before the fire brigade arrived. Structural damage was mainly confined to the south end of the box, but smoke and water damage was caused to much of the equipment. The burnt woodwork had been replaced by mid-February, and the burnt wiring replaced on a "make do and mend" basis in time for the 1977 running season[5]. Further work was done to the box as part of a major re-laying of track at Bridgnorth which began at the end of 1977[6] and was completed in autumn 1978[7].

Contents

Signalling diagram

Bridgnorth Signal Diagram.jpg

Signalling diagram in Bridgnorth as of October 2015.

Levers and Lever Leads

List of levers

No. Colour Description Lever Sequence
1 Red Down Main Home 11
2 Red Down Main To No. 1 Platform Line Inner Home 12 11
3 Red Down Main To No. 1 Platform Line Calling On 12 11
4 Red No. 1 Platform Line To Hollybush Road Siding Starting 29
5 Red Down Main To No. 2 Platform Line Inner Home 13 11
6 Red Down Main To No. 2 Platform Line Calling On 13 11
7 Red No. 2 Platform Line To Hollybush Road Siding Starting
8 SPACE
9 SPACE
10 Red Down Main To Engine Shed Sidings Inner Home 14 13 11
11 Blue F.P.L. For 12 13 or 12
12 Black Down Main To No. 2 Platform Line Facing / No. 1 Platform Line
13 Blue F.P.L. For 14
14 Black No. 2 Platform Line Facing / Engine Shed Sidings
15 Red Engine Shed Sidings To Up Main Starting 14
16 Red Engine Shed Sidings Starting (Disc)
17 SPACE
18 Red No. 1 Platform Line To Carriage Siding Starting 19
19 Black Carriage Siding Safety
20 Red No. 2 Platform Line To Up Main Calling On
21 Red No. 1 Platform Line To Up Main Calling On 12
22 Red+White Band Up Main Advanced Starting
23 Red No. 2 Platform Line To Up Main Starting
24 Red No. 1 Platform Line To Up Main Starting 12
25 Red Disc For 19 19
26 Blue/Brown Interl'k'g Lever For Boiler Shop Ground Frame
27 Black Safety Points in Hollybush Road Siding (Slotted)
28 Red Disc For 27 27
29 Black Platform Lines / + Over
30 Red Disc For 27 27 29

References

See Also