Bridgnorth Station Footbridge
Revision as of 22:23, 5 March 2021 by Patrick Hearn (talk | contribs) (Not moved to the boiler shop, see discussion)
This footbridge (Bridge 37) connects Bridgnorth Station's Platforms 1 and 2. Although both platforms were present at opening on 1 February 1862, the footbridge was added later, its construction being authorised by the GWR on 12 May 1887.[1]
The footbridge last underwent a major refurbishment in 2004, when it was taken down and moved for shot-blasting and powder coating, supported by funds from the SVR's arrangement with the West Bromwich Building Society. A plaque on Platform 2 celebrates the re-opening on 18 May 2004.
In February 2017 the station master appealed for volunteers to repaint the bridge.