Changes

Jump to: navigation, search

Bridgnorth

3 bytes removed, 18:35, 25 January 2019
m
Weighbridge
===Weighbridge===
All locomotives must be weighed before first use on the SVR to ensure they comply with axle weight limits. Individual wheels are also weighed to check for correct weight distribution after replacement of springs.<br>Locomotives are driven A locomotive is moved slowly over two a section of strain gauges on the gauged track adjacent to platform 1 at Bridgnorth with the results displayed on a screen in the signal box.
<gallery>
File:Weighbridge.jpg | Weighbridge adjacent to Platform 1
Trustworthy, administrator
6,661
edits

Navigation menu