Bridgnorth

129 bytes added, 11:39, 22 December 2018
Evolution of plans: Further slippage of phases in SVR News 204
{| class="wikitable sortable mw-collapsible"
! Project !! 2012 share offer !! 2016 share offer !! September 2018 <ref>NBI September 2018</ref> !! SVR News 204 Winter 2018 !! Notes
|-
|New catering and toilets||Included||Phase I, reduced height and size||Phase I||Phase I||Non-uniformed staff catering now (2018) to be included in the Graham Hill building (next to the Boilershop)
|-
|Refurbished station|| Included ||Phase I||Phase III||Phase IV||In November 2016 work was continuing on detailed plans for the refurbishment of the existing station, with the contract for the remaining works of the first phase to be signed in January 2017.<ref>SVR Live</ref> In September 2018 plans and costs were incomplete and "will inevitably take a period of time to reconcile". Phase III Works will not begin before Winter 2019/20 to develop the plans, apply for funding and a period of calm.<ref>NBI September 2018</ref>
|-
|New car park in fields|| Included ||Phase II||Phase II||Phase II||
|-
|Turntable|| Included ||Phase II||Phase IIb (TBC)|| Phase III|| The location has been revised and is subject to a new planning application, costs are also being assessed for remodeling the loco yard at Bridgnorth to accommodate direct access to the turntable and provide space for Platform 2 extension.<ref>NBI September 2018</ref>
|-
|Volunteer accommodation|| Included, in plans for Hollybush Road sidings ||Phase III||Phase IV||Not included||As part of workshop and stores to rear of MPD
|-
|Independent mobility across the site|| Included, by means of additional lifts at the north end of the station ||Not included||Not included||Not included||
|-
|Public viewing area for MPD|| Included ||Not included||Not included||Not included||
|-
|New visitor centre|| Included ||Not included||Not included||Not included||
|-
|}