Changes

Jump to: navigation, search

Bridgnorth

897 bytes added, 20:57, 28 October 2018
Info added
*June 2018 In the rear service yard area, the “Bovey Tracey” outbuilding building had the framework erected and covered in breathable felt ready for the external corrugated cladding to be applied. This is based on a goods lock up that used to adorn Bovey Tracey station on the Moretonhampstead branch in Devon. The SVR version will serve as a plant room housing the heating boiler and food preparation area for the volunteer [[Severn Valley Venturer]] catering staff.
*July 2018 a completion and hand-over was forecast for the third week in July.<ref>SVR News 201, p. 15</ref>. This was followed by a revised plan to open on 3 September. An announcement in September gave a date of end of 2018, with a formal opening in Spring 2019.<ref>SVR Forum, September 2018</ref>
 
===Evolution of plans===
 
{| class="wikitable sortable mw-collapsible"
! Project !! 2012 share offer !! 2016 share offer !! 2018 !! Notes
|-
|New catering and toilets||Included||Phase I, reduced height and size||Phase I||Non-uniformed staff catering now (2018) to be included in MPD
|-
|Refurbished station|| Included ||Phase I||Phase III||
|-
|New car park in fields|| Included ||Phase II||Phase II||
|-
|Turntable|| Included ||Phase II||Phase IIb (TBC)||
|-
|Volunteer accommodation|| Included, in plans for Hollybush Road sidings ||Phase III||Phase IV||As part of workshop and stores to rear of MOD
|-
|Independent mobility across the site|| Included, by means of additional lifts at the north end of the station ||Not included||Not included||
|-
|Public viewing area for MPD|| Included ||Not included||Not included||
|-
|New visitor centre|| Included ||Not included||Not included||
|-
|}
 
<gallery>
Trustworthy, administrator
6,720
edits

Navigation menu