===Objectives===
The Bridgnorth site is the subject of a development project, the first phase of which will see the long-overdue removal of the Portacabin style Refreshment room (installed in 1979 "as a temporary measure"<ref>SVR News 51</ref>; previous buffet facilities having been in an old [[Carriages formerly resident on the SVR#Carriages formerly at the SVR but later moved elsewhere | BR Mk 1 Tourist Second Open]]), and its replacement with a circa-1900 Great Western style single-storey building which will be located to the south of the existing Jacobean style station building. The first phase of the project will also see the refurbishment of the existing station building including the booking hall, shop, and Railwayman's Arms. Later Further phases will see improved car parking facilities, installation of a [[Bridgnorth Turntable|turntable in the station yard]] and, subject to funding, construction of a new volunteer accommodation building.
===Milestones===
*April 2018 roofing took place and the scaffolding was largely removed from the exterior of the building
*June 2018 In the rear service yard area, the “Bovey Tracey” outbuilding building had the framework erected and covered in breathable felt ready for the external corrugated cladding to be applied. This is based on a goods lock up that used to adorn Bovey Tracey station on the Moretonhampstead branch in Devon. The SVR version will serve as a plant room housing the heating boiler and food preparation area for the volunteer [[Severn Valley Venturer]] catering staff.
*July 2018 a completion and hand-over was forecast for the third week in July.<ref>SVR News 201, p. 15</ref>. This was followed by a revised plan to open on 3 September. An announcement in September gave a date of end of 2018, with a formal opening in Spring 2019.<ref>SVR Forum, September 2018</ref>