Changes

Jump to: navigation, search

BR 3MT 82045

1,043 bytes added, 17:49, 16 December 2020
m
New build locomotive 82045: remove 'as of' date
|pressure = 200 lb/sq in
}}
 
[[The 82045 Steam Locomotive Trust]] is building a new locomotive of the Riddles BR 3MT 2‑6‑2T class, none of which survived into preservation. A number of members of this class of tank engines hauled services on the SVR during the BR era.
45 of these locomotives, numbered 82000-82044, were built at BR’s Swindon works between 1952 and 1955. All 45 began service in lined black livery, but many of those that worked on the BR Western Region were later repainted in lined green or latterly in unlined green livery.<ref>82045 Steam Locomotive Trust web site</ref>
13 A further 18 of the class were allocated at various times to Shrewsbury have been built, but the order for these was cancelled as part of BR’s Modernisation Plan. The closure of branch lines such as the Severn Valley and two the replacement of steam by DMU services ultimately led to the withdrawal from service of those already built. None survived into preservation. ==New build locomotive 82045==[[Kidderminster ShedFile:82045_20190323.jpg|thumb|300px|right|82045 at Bridgnorth, March 2019]], with only one The locomotive (82030) featuring on both listsis being constructed at [[Bridgnorth Loco Works]]. At least eight of It has been given the number 82045, which would have been allocated to the next class were photographed in service on member had the Severn Valley Branch while allocated to Shrewsbury:<ref>BR Database</ref>Modernisation Plan not intervened.
{| class="wikitable"! Number !! Loco shed allocation !! Published photographs|-==Progress===|82000 || Shrewsbury 1955-1959 || Bewdley 1960<ref>[[Bibliography#Books|Nabarro Progress on construction at March 2019 can be seen in the picture (1971right)]] p. 28On 17 April 2018, 82045 became a rolling chassis when the locomotive was wheeled at Bridgnorth.</ref>|-|82004 ||Shrewsbury Jun-Sep 1959 || Bridgnorth 1959<ref>82045 was moved into [[Bibliography#Books|Mitchell & Smith (2007)Bridgnorth Loco Works]] pon 23 January 2019. 69 The SVR want 82045 in service and earning its keep as soon as possible, and the decision has therefore been taken to put more work out to contract.</ref>|-|82005 ||Shrewsbury Apr-Jul 1961 || Stourport 1961<ref>The boiler will however be assembled at [[BibliographyBridgnorth Loco Works#BooksBoiler_shop|Mitchell & Smith (2007)boiler shop]] p. 7.</ref> |-|82007 ||Shrewsbury Dec 1955-Jun 1958 || Bewdley 1956<ref>[[Bibliography#Books|Webb]] phttp://www.82045. 20org.<uk/ref>|-|82009 ||Shrewsbury Jun-Sep 1959 ||Coalport 1959<ref>Peter Shoesmith Collection, see infobox<news/ref>|-|82021 ||Shrewsbury Jan82045_news-Mar 1960 || Bewdley 1960<ref>[[Bibliography#Books|Smith (1968)]] papr18. 18.</ref>|-|82031 ||Shrewsbury 1955-1959 ||Bewdley 1957<ref>SVR html 82045 News 146 p. 64.</ref>|-|82032 ||Shrewsbury Apr-Aug 1961, Dec 1961-Jul 1964 ||Kidderminster 1961<ref>SVR News 52 p. 11.April 2018] (Retrieved 26 April2018)</ref>|-|}
A further The Trust issues monthly news updates on its website with progress reports. In June 2019 work on the assembly of the boiler/firebox was due to begin as soon as [[42968|Stanier Mogul 42968]] was finished; taking 15-18 of months with the class were locomotive ready to have been builtsteam six months after that.<ref>[http://www.82045.org.uk/news/82045_news-dec18.html 82045 News, but December 2018]</ref><ref>SVR News 205</ref> In March 2020 work at Bridgnorth was halted by the order for these was cancelled as part [[2020 coronavirus disease (COVID-19) pandemic]], work resumed on the assembly of BR’s Modernisation Planthe boiler and firebox by September. The closure of branch lines such as Trust are still hopeful that 82045 will steam in 2022, although towards the Severn Valley and the replacement latter end of steam by DMU services ultimately led to the withdrawal from service of those already built. None survived into preservationyear.<ref>82045 Fund Newsletter No 33 - Autumn 2020</ref>
==New build locomotive 82045==The project was one of those that suffered in 2011 from the [[Bridgnorth Loco Works#2011_Copper_theft|theft]] of copper sheets that had been cut to size for the firebox.
The locomotive is being constructed at In 2011 the project was the beneficiary of SVRA's 'Cylinders for 82045' raffle. Including donations the gross income was over £21.000 with a net surplus of around £17,000.<ref>[[Bridgnorth]https://forum.svr-online.org.uk/viewtopic.php?t=2346&highlight=raffle SVR Forum]. It has been given (Retrieved 23 March 2019)</ref> In 2016 it was the number 82045Guarantee Company's "Slidebars and Crossheads" raffle which, which would have been allocated in combination with an appeal to the next class member had the Modernisation Plan not intervenedshareholders and further boosted by cash donations, generated over £30,000 for 82045.<ref>[http://www.82045.org.uk/news/82045_news-sep16. html News Update - September 2016, The 82045 SLT website] (Retrieved 23 March 2019)</ref>
Progress on construction at February 2016 can be seen in the pictures below. On 17 April 2018, 82045 became a rolling chassis when the locomotive was wheeled at Bridgnorth. The SVR want 82045 in service and earning its keep as soon as possible, and Trust has also sourced some common components with the decision has therefore been taken to put more work out to contract. The boiler will however be assembled at [[Bridgnorth Loco Works#Boiler_shop|boiler shop]]<ref>[http://www.82045.org.uk/news/82045_newsBluebell Railway Standard Class 2 Project which is building BR Class 2MT 2-6-apr18.html 82045 News, April 2018] (Retrieved 26 April2018)</ref> The Trust issues monthly news updates on its website with progress reports2 Tank Locomotive No 84030.
===Livery===
The Trust’s website notes that "''As 82045 was destined for the WR had it been built as planned in 1956, it was decided that the loco when finished should appear in the attractive Swindon-inspired livery of dark green, lined out in orange and black. A subsequent repaint into lined black hasn't been ruled out, though.''"
The ==Model==In 2018, the Trust has also sourced some common components with produced a limited number of models of 82045, and although the Bluebell Railway Standard Class 2 Project which offer is building no longer being promoted, {{as of|2019|05|lc=y}}, two models remain on display at [[Bridgnorth Station Shop]].<gallery>File:82045modelgreen.jpg | 82045 model in BR Class 2MT 2-6-2 Tank Locomotive No 84030GreenFile:82045modelblack.jpg | 82045 model in BR Black</gallery>
===Gallery===
<gallery>
File:82045_20160213.jpg | 82045 at Bridgnorth in February 2016
*[[Steam Locomotives | List of steam locomotives on the SVR]]
*[[The 82045 Steam Locomotive Trust]]
*[[Locomotives used on the Severn Valley Branch in commercial service]]
*[[Locomotives used on the Severn Valley Branch in commercial service|Classes of locomotives used on the Severn Valley Branch in commercial service]]
== References ==
*[http://www.82045.org.uk/ The 82045 Steam Locomotive Trust web site]
*[http://en.wikipedia.org/wiki/BR_Standard_Class_3_2-6-2T BR Standard Class 3 2-6-2T on Wikipedia]
*[http://www.bluebell-railway.co.uk/bluebell/locos/84030.html the The Bluebell Railway Standard Class 2 Project] [[Category:Locomotives at Bridgnorth]]
{{SteamNavbox}}
[[Category:Locomotives at Bridgnorth]]
[[Category:Featured articles]]
[[Category:SVR fundraising lotteries]]
Trustworthy, administrator
6,720
edits

Navigation menu