Changes

Jump to: navigation, search

Arley signal box

65 bytes added, 17:02, 8 February 2015
add details of Arley box move
== Description ==
The current signal box was reconstructed from 1974 to 1976 on the site of the original signal box, which had been demolished. The frame, which has 30 levers, was previously used at the old Kidderminster Station signal box; the . The box superstructure was moved by road from Yorton, on the LNWR route between Shrewsbury and Crewe, to Hay Bridge, from where it was moved by rail to Arley. The signal box was fully commissioned on April 10th 1976.
At present 23 levers are in use, with 6 spaces and one spare lever.
Trustworthy, administrator
11,873
edits

Navigation menu