Changes

Jump to: navigation, search

2020 coronavirus disease (COVID-19) pandemic

2,271 bytes added, 18:15, 2 July 2020
Trains from August 2020
*On 10 May the government announced plans to ease lockdown restrictions in England to enable more people to go back to work, but that people should avoid public transport for social distancing reasons. At the earliest shops would not open until June and pubs and restaurants until July.<ref>[https://www.bbc.co.uk/news/explainers-52530518 BBC News, 11 May 2020] (Retrieved 11 May 2020)</ref> People in England should now aim to wear face coverings in enclosed spaces where social distancing is not always possible, such as on public transport and in some shops.
*On 11 May the ORR published heritage railways recovery plan guidance, reminding them always to risk assess their return to service.<ref>[https://orr.gov.uk/__data/assets/pdf_file/0010/42877/heritage-railway-recovery-plan-in-response-to-covid-19.pdf</ref>
*On 12 May the furlough scheme was extended until 31 October but with employers to be responsible for part of the cost from 1 August.*On 9 June it was announced all shops could open in England from 15 June. From the same date face coverings became required while using public transport in England, but guidance remained to avoid public transport where possible.*On 23 June relaxations were allowed on social distancing, and opening of pubs from 4 July.
===Timeline of events on the SVR===
*On 21 May the SVR launched a survey, to gauge public attitudes to reopening.
*By 1 June the appeal raised more than £745,000.
*In early June it confirmed there would be no train services in Julyand Steam on the Road, Classic Car Day and On The Buses events were cancelled. Services for August were provisionally advertised to run on 1, 8, 9, 15, 22, 29, 30 and 31 August.*On 11 June it announced the railway would gradually bring back its 1,800 volunteers, along with paid staff, 95% of whom were currently on furlough. Gradually works recommenced, with relaying at Foley Park restarting from 15 June. It was planned to reopen pubs on 4 July and recommence passenger services at the beginning of August.<ref>[https://www.shropshirelive.com/news/2020/06/12/severn-valley-railway-looks-to-an-august-reopening/ Shropshire Live 11 June 2020] (Retrieved 21 June 2020)</ref>*On 23 June it announced that the King and Castle Pub at Kidderminster would reopen on 4 July.<ref>[https://www.svr.co.uk/NewsItem.aspx?a=927 SVR website]</ref> Three days later it announced that the Railwayman's Arms at Bridgnorth would also open on 4 July<ref>[https://www.svr.co.uk/NewsItem.aspx?a=928 SVR website]</ref>.*On 2 July the services were announced for trains from August: travel on set services at specific times from Kidderminster or Bridgnorth; tickets only for compartments purchased in advance (no tickets on the day), and travel in pre-booked compartments accommodating a maximum of six people, reserved for the visitor's exclusive use all day.
==Effects on the SVR==
The SVR also announced it would not be able "to make our crucial annual investment into the Railway. This amounts to £4.5million, and funds essential restorations to our infrastructure and rolling stock, along with apprentice training and a desperately needed overhaul of our IT infrastructure"<ref>[https://www.railadvent.co.uk/2020/04/severn-valley-railway-future-safe-as-416000-raised-in-appeal.html? Holden, M., Rail Advent 17 April 2020] (Retrieved 18 April 2020)</ref>.
 
The Railway could lose up to £6 million income in 2020.<ref>[https://www.shropshirestar.com/entertainment/attractions/2020/06/11/severn-valley-railway-to-reopen-in-august/ Shropshire Star 11 June 2020] (Retrieved 21 June 2020)</ref> It applied to HSBC for a £1.5 million loan under the CBILS scheme, which alongside its existing overdraft facility would mean £3 million available. The SVR Charitable Trust applied for a [[:Category:Lottery funding|National Lottery Heritage Fund]] grant to support the reopening of the Railway<ref>[https://www.svrlive.com/epjun20 Express Points, June 2020]</ref>.
==See also==
Trustworthy, administrator
6,658
edits

Navigation menu