February 5

Revision as of 22:04, 7 February 2018 by Robin (talk | contribs) (edit link)

On February 5 in SVR history.

  • 1979 A contract for extending the station bar and cellar at Bridgnorth was awarded to the building contractors.[1]
  • 1983 A 30ft deep hole was being dug at Hampton Loade to lay a pipe to carry a spring under the railway.[2]
  • 1989 Half a mile of track was being relaid in Alveley Woods. Newly restored Class 25 Diesel D7633 was in charge of the works train[3].

See also

On this day in SVR history

← February 4 - February 6 →

References

  1. SVR News 51
  2. SVR News 71
  3. SVR News 91