:On 5 December a power-twin set of vehicles 50933 and 52064 became the first [[Class 108 DMU|DMU]] to operate for two years following bogie repairs, when it operated the Christmas staff train.<ref name="bldec20"/>
:On 9 December a special autotrain ran with [[GWR 1450|1450]] and [[GWR 178 Autotrailer Third]] for several trips between Bridgnorth and Highley for the [[Pull Push Limited|owner]] to mark the end of the locomotive's boiler ticket.<ref name="bldec20"/>
:The civil engineering work on Falling Sands Viaduct was completed in mid-December with the final piece of corbelling being slotted into place.<ref name=bljan21>[https://www.svrlive.com/bljan21 Branch Lines, January 2021]</ref>
:On 17 December [[4930| 4930 Hagley Hall]]’s boiler arrived back from Northern Steam Engineering following its extensive overhaul.
:On 29 December snowfall resulted in the day's services bring cancelled.
'''January 2021'''
*A reduced programme of winter works commenced consolidating works undertaken in 2020, with major works deferred<ref>[https://www.svrlive.com/name=bljan21 Branch Lines, January 2021]</ref>.