Operation to Arley (short section) or Highley (long section) is carried out under ETT Regulations.
All signals controlled by Bewdley North are of late GWR/BR(W) steel tubular post design with enamel arms. Signals 29, 31 and 33 are of unusual centre pivot design, used where a conventional design signal's sighting may be compromised. These have wooden arms, although they are otherwise of the late GWR/BR(W) steel tubular post design. Signals 30, 31, 33, 35 and 36 are pre-preservation, although originally signal 30 had a sister arm on its bracket, the place for which can still be seen.
== Diagram ==