</gallery>
==== Platform 1 ====
Platform 1 originally ended by the water tower. An extension was added in 1981 using materials recovered from the ex-GWR goods shed at Cradley. There is a noticeable change in the appearance of the platform at that point, which can be seen in this photograph.
<gallery>
File: Bridgnorth_Platform_20150503.jpg | Bridgnorth Platform 1
</gallery>
==Bridgnorth Timeline==