Changes

Jump to: navigation, search

Bridgnorth

370 bytes added, 16:24, 17 June 2015
add info on the extension of Platform 1
</gallery>
==== Platform 1 ====
 
Platform 1 originally ended by the water tower. An extension was added in 1981 using materials recovered from the ex-GWR goods shed at Cradley. There is a noticeable change in the appearance of the platform at that point, which can be seen in this photograph.
 
<gallery>
File: Bridgnorth_Platform_20150503.jpg | Bridgnorth Platform 1
</gallery>
==Bridgnorth Timeline==
Trustworthy, administrator
11,925
edits

Navigation menu