Changes

Jump to: navigation, search

Buildwas

654 bytes added, 09:50, 14 May 2023
Additional closure dates added
</gallery>
Passenger services from Craven Arms via Much Wenlock ceased on 31 December 1951, and between Wellington and Much Wenlock via Buildwas ended on 23 July 1962. In the same year Parliamentary approval for Ironbridge B Power Station was sought and granted, even though consent for the closure of the Severn Valley Branch had not yet been given. Buildwas station closed along with the Severn Valley Line in September 1963, but the line to Buildwas remained open from Longville (south of Wenlock) for freight until 4 December 1963 and from Ketley (on the Wellington line) until 6 July 1964. Buildwas was demolished in 1964 to make way for a new coal handling plant for the power station. Coal traffic for Ironbridge B Power Station continued from Madeley Junction, on the main line between Shifnal and Telford Central, until 2016.
==Signalling==
==References==
<references />
 
[https://rogerfarnworth.com/2022/07/18/the-railways-of-telford-the-wellington-to-severn-junction-railway-wsjr-part-3-lightmoor-junction-to-buildwas/ Farnworth R., The Railways of Telford]
{{StationNavbox}}
[[Category: Featured articles]]
Trustworthy, administrator
6,759
edits

Navigation menu