Changes

Jump to: navigation, search

Acceptance Lever

37 bytes added, 17:15, 25 January 2015
no edit summary
A method of operating a single line railway without the use of [[Single line working using tokens | tokens]] or staffs. It relies on the section being [[Track Circuit]]ed throughout. Acceptance Lever working is used over the [[Bewdley South signal box|Bewdley South]] to [[Kidderminster signal box|Kidderminster]] single line section. It was first brought into use on 21 November 1987.
 
==Method of Operation==
"to follow"
Trustworthy, administrator
216
edits

Navigation menu