Changes

Jump to: navigation, search

Hampton Loade

238 bytes added, 17:43, 17 July 2023
add info from 1960 WTT
*1922: [[SVR staff in 1922#Severn Valley Railway (Kidderminster to Bridgnorth)|GWR staff records]] show the station had a staff of 3, comprising the stationmaster and two porter/signalmen.
*1930s: Hampton Loade was the site of a [[Arley Camp Coach|GWR camping coach]] pre-World War 2<ref name = MarshallP101" />.
*1960: The loop capacity, for the purpose of crossing trains, was 23 wagons, plus engine and brake van.<ref>Sectional Appendix to the Working Time Tables and Books of Rules and Regulations, Birmingham Traffic District, October 1960</ref>
*1963: Through passenger services ceased on 9 September, with through freight services ending at the end of November.

Navigation menu