January 2018 - 40135 on hire, not 40145.
'''January 2018'''
:On 1-2 January [[SR 34053 Sir Keith Park]] completed farewell turns in advance of her departure to the Swanage Railway on 10 January
:The SVR announced the hire of [[Diesel Locomotives hired by the SVR|diesels 37688 and 4014540135]] for 2018-2019, the former for PWay work and the latter to utilise its steam heat capability. [[BR Class 50 50026 Indomitable|50026 Indomitable]] arrived for commercial repairs in the [[Diesel Depot]]. Didcot Railway Centre announced 6023 'King Edward II' would be moved by road to the SVR in February for testing of her revised draughting, then operating some timetabled trains and attending the Spring gala.
:Winter works saw track either side of [[Bewdley Tunnel]] being cleaned of badly contaminated ballast; the last part of the remedial work to the embankment slippage around the [[Accommodation bridge near Severn Lodge|County Boundary]] area; the partial rebuilding of the platform face at [[Eardington]]; lining of the loco water tank at [[Kidderminster]], and at the same location swapping the water column adjacent to platform 1 runround from a fixed column to a standard GWR swing arm type. At [[Waterworks Crossing|Waterworks straight]] welding was completed to a position that restored line speed following Winter Works in 2017. Permanent Way work also took place at [[Highley|Highley bank]] and [[Kidderminster Carriage Shed]].<ref>[https://www.svrlive.com/winter-works-2018 SVRLive]</ref>
:On 16 January [[Severn Valley Railway Charitable Trust Ltd|the Charitable Trust]] announced it had reached its appeal target of £10,000 in under a month, for the cost of repairing the vehicles damaged by graffiti in December.