Changes

Jump to: navigation, search

Talk:Bridgnorth signal box

436 bytes added, 23:06, 14 December 2015
no edit summary
:Supporting that view, there was a comment during the slideshow at KRM this week, the gist of which was that the Arley frame was transported to Bridgnorth but "dropped in transit" and "wasn't much use thereafter".--[[User:Robin|Robin]] ([[User talk:Robin|talk]]) 18:45, 14 December 2015 (UTC)
 
:Marshall is a bit vague but I think his exact words are telling: "In the late summer [of 1969 the box structure] was handed over...to the S&T for installation of the frame, interlocking, instruments etc, and for connecting to points and signals. Much of this was removed from Arley with a lack of foresight which gave rise to numerous excuses." --[[User:WillSalt|WillSalt]] ([[User talk:WillSalt|talk]]) 23:06, 14 December 2015 (UTC)
Trustworthy, administrator
300
edits

Navigation menu