Changes

Tales from the Severn Valley

25 bytes added, 07:31, 27 March 2016
Coal for Stourport Power Station: trying out <noglossary> tag
"I started my career with the NCB at Highley, spending some time on the screens, so seeing the loads going out. I also spent time in the survey office and later as an official there so knew the production which came from one seam only (the Brooch). It was good house coal. <br>
I doubt that the total weekly output from Alveley (the coal winding shaft of Highley unit) would keep the power station going for 24 hours, and as only about 30% went to Stourport, the bulk of coal needed there would have to come from somewhere else. The Highley/Alveley unit was only a small mine. <br>
<noglossary>Up </noglossary> until 1954, I lived overlooking Kidderminster station, and regularly saw the coal trains coming down from Stourbridge, often with a super D on the front. Inside the hour, the super D would appear light engine from Bewdley, now facing North, to then trundle off tender first to Hartlebury, appearing some time later with empties. The 56xx at Kiddy, sometimes a 57xx, was stationed at Hartlebury to work the coal and empties to and from Stourport, I later worked at other pits in Shropshire, finishing on Cannock Chase, where I knew that coal went to Stourport and Ironbridge from Littleton colliery, a much bigger pit than Highley."
==See also==