Changes

Jump to: navigation, search

Sutton Bridge Junction Signal Box

201 bytes added, 18:17, 2 January 2016
no edit summary
The box was thoroughly measured in the 1980s by an SVR volunteer to ensure accuracy in the plans for [[Kidderminster_Station_signal_box_(1987_onwards)|Kidderminster Station signal box]].
 
Current published plans indicate the box will be closed in 2025 with its area of control passed to Cardiff Rail Operating Centre (ROC), although it remains to be seen if this target will be achieved.
==Signalling diagram==
Trustworthy
98
edits

Navigation menu