Severn Valley Railway Timeline 2000-2009

Revision as of 17:04, 27 January 2015 by Robin (talk | contribs) (remove 2015, now under current events)

Significant events in the history of the Severn Valley Railway in preservation between 2000 and 2009 are set out below. This page is currently under construction.

Contents

2001

2002

2003

2004

2005

2006

2007

Freak thunderstorms on 19 June and 20 July 2007 caused massive damage to the SVR. The line was breached in 45 separate locations[1] between Bridgnorth and Northwood Halt, embankments collapsed, cuttings were filled with debris, Highley Up starting signal slid down the embankment, and much other destruction took place. Only the section between Bewdley and Kidderminster remained relatively unaffected. ( BBC photo )

Although a massive rebuilding exercise began at once[1], the line did not reopen fully until 21 March 2008. The damage also caused the opening of The Engine House at Highley, planned for 2007, to be delayed until the following year.

2008

2009

See also

Sources

SVR News unless otherwise stated.
  1. 1.0 1.1 SVR Website. Retrieved 24 January 2015.