Changes

Jump to: navigation, search

Severn Valley Railway Timeline 1965-1969

67 bytes added, 12:08, 7 January 2019
add image
'''August 1965'''
[[File:Archive poster 12.jpg|thumb|300px|right|Early SVRS poster]]
:The Society’s initial goal was to operate services over the 4½ miles between Bridgnorth and Hampton Loade. However the Society would also need to take on the track between Hampton Loade and Milepost 144½ near [[Alveley Sidings|Alveley]] in order to maintain a connection to the main line via the section beyond, which BR was still using for colliery traffic from [[Alveley Colliery]].

Navigation menu