Loop Line specification and contract

445 bytes added, 08:37, 11 October 2020
Start on formatting text and margin notes as a table
General Specification
{||-| style="vertical-align:top; width: 20%;" | 1 . The contractor to execute all works<br><br><br><br><br><br>To supply all materials &c || The contractor shall to the satisfaction of the Engineer in a workmanlike substantial and lasting manner construct and execute all the Works herein mentioned and specified or referred to whether temporary or permanent including all contigent and incidental works and shall construct and execute all the said Works, and in the manner and according to the directions and provisions herein respectively as delineated on the Drawings enumerated herein after mentioned specified or referred to or in any detailed or modified Specifications Drawings Plans Sections or written instructions which may from time to time be given to the Contractors by the Engineer, and in and for the construction and execution of the said works, the Contractor shall provide and supply all the materials plant articles and things which according to this specification are to be provided by the Contractor or which may be requisite or proper for the due performance of the works and of all the kinds descriptions and qualities specified in or to be inferred from this Specification and the Drawings or from any detailed Specification Plans Drawings Sections or written instructions as aforesaid of the best and most proper kinds or descriptions respectively to the satisfaction of the Engineer, and shall also find and provide all labour tools plant and machinery requisite or proper for the due performance of the work, and in executing the same shall perform fulfill obey and abide by all the directions provisions terms and conditions of this Specification and the Drawings and of any such detailed Specifications and written instructions as aforesaid and shall be subject to the several liabilities and obligations in case of default herein mentioned it being the intention of these Presents that the Contractor shall do execute and provide in accordance with this Specification everything requisite or proper for the entire performance of the said Works.  |-| style="vertical-align:top;" | 2. Contract includes all materials &c<br><br>Except permanent way<br><br>Time for completion || The Works comprised in the Contract include earth work in every variety of material whether in soft earth or rock, all fences temporary and permanent, all brick, stone, timber and iron work and all work materials and labour of every description necessary for the constructions and completion of the respective Railways up to the formation level, the providing and laying thereon of the ballast and also the laying of the permanent way (the materials of which are provided by the Company) and the delivery of the whole of the said works in a complete and perfect condition to the Company on or before the 31st day of October 1875.|-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-| | |-|}       
To supply all materials &c
The contractor shall to the satisfaction of the Engineer in a workmanlike substantial and lasting manner construct and execute all the Works herein mentioned and specified or referred to whether temporary or permanent including all contingent and incidental works and shall construct and execute all the said Works, and in the manner and according to the directions and provisions herein respectively as delineated on the Drawings enumerated herein after mentioned specified or referred to or in any detailed or modified Specifications Drawings Plans Sections or written instructions which may from time to time be given to the Contractors by the Engineer, and in and for the construction and execution of the said works, the Contractor shall provide and supply all the materials plant articles and things which according to this specification are to be provided by the Contractor or which may be requisite or proper for the due performance of the works and of all the kinds descriptions and qualities specified in or to be inferred from this Specification and the Drawings or from any detailed Specification Plans Drawings Sections or written instructions as aforesaid of the best and most proper kinds or descriptions respectively to the satisfaction of the Engineer, and shall also find and provide all labour tools plant and machinery requisite or proper for the due performance of the work, and in executing the same shall perform fulfill obey and abide by all the directions provisions terms and conditions of this Specification and the Drawings and of any such detailed Specifications and written instructions as aforesaid and shall be subject to the several liabilities and obligations in case of default herein mentioned it being the intention of these Presents that the Contractor shall do execute and provide in accordance with this Specification everything requisite or proper for the entire performance of the said Works.
2 Contract includes all materials &c
Except permanent way
Time for completion
The Works comprised in the Contract include earth work in every variety of material whether in soft earth or rock, all fences temporary and permanent, all brick, stone, timber and iron work and all work materials and labour of every description necessary for the constructions and completion of the respective Railways up to the formation level, the providing and laying thereon of the ballast and also the laying of the permanent way (the materials of which are provided by the Company) and the delivery of the whole of the said works in a complete and perfect condition to the Company on or before the 31st day of October 1875.
3 Contractor not to interfere with conveniences of the adjoining properties &c