Loop Line specification and contract

150 bytes added, 08:49, 11 October 2020
formatting
|-
| style="vertical-align:top;" | 2. Contract includes all materials &c<br><br>Except permanent way<br><br>Time for completion || The Works comprised in the Contract include earth work in every variety of material whether in soft earth or rock, all fences temporary and permanent, all brick, stone, timber and iron work and all work materials and labour of every description necessary for the constructions and completion of the respective Railways up to the formation level, the providing and laying thereon of the ballast and also the laying of the permanent way (the materials of which are provided by the Company) and the delivery of the whole of the said works in a complete and perfect condition to the Company on or before the 31st day of October 1875.
 
 
|-
| style="vertical-align:top;" | 3. Contractor not to interfere with conveniences of the adjoining properties &c | | The Contractor shall not in carrying out the works interfere with the free and uninterrupted use by the respective Proprietors of any of the Railways, Canals, Watercourses, Roads or other conveniences adjoining or near the new Railway and shall perform all temporary or permanent works, such as alterations, diversions or substitutions which may be necessary to secure the same.  
|-
| style="vertical-align:top;" | 4. Contract to be with Great Western Railway<br>Interpretation of “Company” || The Contract to be based on this Specification is intended to be made with the Great Western Railway Company (hereinafter called "The Company") and whenever the word "Company" is used herein it shall be taken as referring to the said Great Western Railway Company.  
|-
| style="vertical-align:top;" | 5. “Engineer” || Whenever the word "Engineer" occurs herein it shall be taken as meaning Edward Wilson of 9 Deans Yard Westminster or n case of his death incapacity or removal the Engineer in Chief for the time being of the Company.  
|-
| style="vertical-align:top;" | 6 “Contractor” || The word "Contractor" shall be taken to apply equally to all and each of the Partners of firm (if any) entering into a contract with the said Company or to any single individual making such Contract.  
|-
| style="vertical-align:top;" | 7 “Authority” || “Authority” or “orders in writing” and all expressions to that effect shall apply to any printed or written Documents signed by the Secretary or Engineer of the Company whether such documents be letters notices drawings or sketches.  
|-
| |
 
 
 
 
 
 
3 Contractor not to interfere with conveniences of the adjoining properties &c
The Contractor shall not in carrying out the works interfere with the free and uninterrupted use by the respective Proprietors of any of the Railways, Canals, Watercourses, Roads or other conveniences adjoining or near the new Railway and shall perform all temporary or permanent works, such as alterations, diversions or substitutions which may be necessary to secure the same.
 
4 Contract to be with Great Western Railway
Interpretation of “Company”
The Contract to be based on this Specification is intended to be made with the Great Western Railway Company (hereinafter called "The Company") and whenever the word "Company" is used herein it shall be taken as referring to the said Great Western Railway Company.
 
5 “Engineer”
Whenever the word "Engineer" occurs herein it shall be taken as meaning Edward Wilson of 9 Deans Yard Westminster or n case of his death incapacity or removal the Engineer in Chief for the time being of the Company.
 
6 “Contractor”
The word "Contractor" shall be taken to apply equally to all and each of the Partners of firm (if any) entering into a contract with the said Company or to any single individual making such Contract.
 
7 “Authority”
“Authority” or “orders in writing” and all expressions to that effect shall apply to any printed or written Documents signed by the Secretary or Engineer of the Company whether such documents be letters notices drawings or sketches
8 Company to deliver lands to Contractor