| style="vertical-align:top;" | 51. Penalty for delay incompletion in completion || The Contractor shall complete the whole of the works comprised in this Contract to the satisfaction of the Engineer on or before the 31st day of October 1875 and for every days delay in so completing the works he shall forfeit to the company by way of ascertained and liquidated damages, the sum of Twenty pounds.
A drain shall be made in each side of the Railway on top of cuttings and at foot of embankments as shewn on Drawing No 4 of such depth as effectually to carry off all water but in no case shall it be less than 18 inches in depth and of the proper slope and form as shewn on the drawings and whenever it intersects cross drains the water from such cross drains shall be properly carried into it and it shall be well puddled opposite all such cross drains.
All wrought fencing shall have four coats of best oil paint the last coat of such color as the Engineer may direct. The posts of approach fencing shall be of English Oak 6 ft 6 in by 4 in and when firmly fixed in the ground it shall stand 4 feet above the surface, the distance from centre to centre of post to be 6 feet. The rails shall be three in number made of best red wood the top rail being 4 inch square set on edge in a birds mouth cut in the top of the post and firmly secured to the post by an iron strap 15" long on each side by 2" wide by one eighth of an inch in thickness. The rails shall be continuous and in lengths of not less than 18 feet properly scarfed and jointed on the top of the post – The other two sails rails shall be 3½ inches deep by 2 inch thick well and securely morticed into the post – The whole of the posts and sails rails to be planed and wrought truly square
==Links==
*[https://en.wikipedia.org/wiki/Edward_Wilson_(engineer) Edward Wilson on Wikipedia]
 
[[Category:The Severn Valley Railway under GWR/BR ownership]]

Navigation menu