Changes

Jump to: navigation, search

Loop Line specification and contract

904 bytes added, 20:43, 11 October 2020
add text
|-
| || || style="width: 10%;" | || style="width: 53%;" | £ || style="width: 53%;" | s || style="width: 53%;" | d
|-
| || Post and rail fence with quick set edge and ditch || per linear yard || - || 1 || 8
|-
| || Excavation for line carried to embankment including soiling and sowing slopes & not being in close rock of any lead || per cubic yard || - || - || 10
|-
| || Excavation as above but in closed rock of any lead || style="text-align:center;" | "       "       " || - || 1 || 9
|-
| || Excavation for tunnel carried to embankment and being almost entirely in close rock of any lead || style="text-align:center;" | "       "       " || - || 5 || -
|-
| || Excavation for road approaches River and Stream diversions & foundations carried to embankment || style="text-align:center;" | "       "       " || - || 1 || 6
|-
| || Embankment for forming raised road approaches including soiling and sowing slopes || style="text-align:center;" | "       "       " || - || 1 || -
|}

Navigation menu