Changes

Jump to: navigation, search

LNER 43600 Open Third

1 byte removed, 06:41, 8 September 2020
typo
</gallery>
During January to May 2016 further work was carried out on the roof as a joint volunteer/full time staff project and included stripping off the old roof covering (dating from c1987,) securely re-fastening the T&G roof boards to the transverse steel hoops with countersunk set screws and applying a new canvasscanvas,rainstrips and tacking rails. The opportunity was taken to apply a further 2 coats of varnish to the exterior, thus prolonging its life before the next major overhaul. This work was completed and it returned to traffic on 18th May 2016.
Early in 2016, a principal supplier of 24 Volt LED lamp bulbs introduced a 40 Watt equivalent "golf ball" style bulb, the installation of which would improve lighting levels and reduce power consumption. A public appeal raised sufficient money to replace all of the lamp bulbs in the LNER carriages of set N. The electrician reports that since the replacement, Set N has required very little top up charging from battery chargers as the dynamos are now able to supply sufficient current to charge the batteries (as they should).

Navigation menu