Changes

Kidderminster Station signal box (1987 onwards)

165 bytes added, 13:08, 8 July 2020
Signalling diagram 2020 added
[[File:Kidderminster diagram 25.jpg|1000px]]
 
From 2020 the box will also control access to the [[Ground Frames at Foley Park|Foley Park ground frame]]. How the signal box diagram will look once the ground frame has been installed:
 
[[File:Kidderminster signal box diagram 2020 including Foley Park Ground Frame.jpg]]
== Levers and Lever Leads ==
Signals 2, 5 and 56 are motor worked.
 
From 2020 the box will also control access to the [[Ground Frames at Foley Park|Foley Park ground frame]].
==2013 fire==
The box is occasionally open for public visits during special events such as the [[Open House Weekend]]. Access is strictly controlled on such occasions as the box is reached by crossing the tracks from the platform.
==See Alsoalso==
* [[List of signal boxes]]
Trustworthy, administrator
6,762
edits