Difference between revisions of "June 1"

From SVR Wiki
Jump to: navigation, search
(add info)
(add info)
Line 2: Line 2:
  
 
*1868 [[Eardington]] Station opened.
 
*1868 [[Eardington]] Station opened.
 +
*1869 [[Wyre Forest Line#Wyre Forest | Wyre Forest]] Station opened.
 
*1878 The [[Kidderminster Loop Line]] opened.
 
*1878 The [[Kidderminster Loop Line]] opened.
 
*[[Severn Valley Railway Timeline 1965-1969#1967 | 1967]] Contracts were exchanged between BR and the SVR for the purchase of the line between Bridgnorth and Alveley.
 
*[[Severn Valley Railway Timeline 1965-1969#1967 | 1967]] Contracts were exchanged between BR and the SVR for the purchase of the line between Bridgnorth and Alveley.

Revision as of 18:47, 21 May 2017

On June 1 in SVRSevern Valley Railway history.

  • 1868 Eardington Station opened.
  • 1869 Wyre Forest Station opened.
  • 1878 The Kidderminster Loop Line opened.
  • 1967 Contracts were exchanged between BRBritish Rail or British Railways and the SVRSevern Valley Railway for the purchase of the line between Bridgnorth and Alveley.

See also