Difference between revisions of "Highley"

From SVR Wiki
Jump to: navigation, search
Line 1: Line 1:
Highley station has one platform and a yard containing two sidings. The yard is not signalled for through moves or passenger trains, but can be used to pass non-passenger trains with another train in the platform
+
Highley station has one platform and a yard containing two sidings. The yard is not signalled for through moves or passenger trains, but can be used to pass non-passenger trains with another train in the platform.
 +
 
 +
== See Also ==
 +
 
 +
[[List of stations]]

Revision as of 21:44, 10 January 2015

Highley station has one platform and a yard containing two sidings. The yard is not signalled for through moves or passenger trains, but can be used to pass non-passenger trains with another train in the platform.

See Also

List of stations