2 bytes removed, 10:54, 21 January 2022
High speed testing between Bewdley and Kidderminster: typo
*2016: Recently converted locomotives [[Diesel Locomotives visiting the SVR for galas|73951 and 73952]] ran test trains in July 2016 between 1900-2300, after the end of daily services.<ref>[https://forum.svr-online.org.uk/viewtopic.php?t=3719&highlight=testing SVR Forum]</ref>
*2021: Between 16 June and 3 July the SVR hosted a test contract for [[Other rolling stock visiting the SVR|Bayer Environmental Science's Smart Weed System Train]] with GBRf 66709 ‘Sorrento’ and 66771 ‘Amanda’. Testing took place at 35 mph and at Bewdley and mainly used a 200 metre site near Bewdley South Down Distant Signal.