Changes

Jump to: navigation, search

Hampton Loade signal box

64 bytes added, 19:27, 5 January 2015
Operation and Equipment
The box works in both directions using Electric Token Block regulations, has two Tyer's No. 9 token instruments, and is able to switch out. The adjacent signal boxes are Highley (up) and Bridgnorth (down), which work directly to each other when Hampton Loade is switched out. The intermediate siding at [[Eardington]] can only be accessed on the long section token.
 
=== Signalling diagram ===
 
[[File:Hampton Loade box diagram]]
== See Also ==

Navigation menu