Changes

Jump to: navigation, search

Hampton Loade signal box

115 bytes added, 08:08, 19 December 2015
Operation and Equipment
=== Lever Frame ===
Hampton Loade contains a 16-lever GWR 5-bar vertical tappet framedating from 1938, put together from a frame from replacing the original which was removed and scrapped on the closure of the line. It was originally in Ledbury North EndSignal Box, with 15 working levers, no spares, and one space.
=== Block Sections ===
Trustworthy
98
edits

Navigation menu