Changes

Jump to: navigation, search

Hampton Loade signal box

341 bytes added, 16:27, 5 January 2015
no edit summary
== History ==
The original signal box was built in 1883 (?), in conjunction with the addition of a loop and second platform to the station. On the closure of the line in 1963, the box was largely dismantled, with parts reportedly being used The section to build a chicken coop in Highley latterly contained two ground frames released by the garden of the station house. The box was rebuilt, starting in 1971token, using parts from the original box and that at Stourport, incorporating the lever frame from Ledbury Alveley North End. The new box and signalling was recommissioned on 19/05/1973Alveley South, initially working allowing access to Bridgnorth using One Engine in Steam, and then Electric Token Block a few weeks later after the commissioning of the coal sidings at Alveley. An intermediate token instruments. The ETT section to Highley instrument was signed into use on 02/03/1974also provided.
On the closure of the line in 1963, the box was largely dismantled, with parts reportedly being used to build a chicken coop in the garden of the station house. The box was rebuilt, starting in 1971, using parts from the original box and that at Stourport, incorporating the lever frame from Ledbury North End. The new box and signalling was recommissioned on 19/05/1973, initially working to Bridgnorth using One Engine in Steam, and then Electric Token Block a few weeks later after the commissioning of the token instruments. The ETT section to Highley was signed into use on 02/03/1974, with the token releasing Alveley South ground frame. The box gained the ability to switch out by Whitsun in 1975, and GWR/BR working timetables suggest that the box was never able to do this historically. And the down and up distants were brought into use in 1981 and 1982.
Several overhauls of the box equipment have been carried out, including point rodding in 1982, rewiring in 1983, the mechanical interlocking in 1992, and a second rewiring in 2012/2013. The latter was done in conjunction with the resiting of the token instruments, which had previously been sited on the brick support for the fireplace, which was not rebuilt in 1973. A replacement fireplace and chimney were brought into use on 27/12/2014.
* "Hampton Loade". Signal box profile on the Severn Valley Railway S&T Department (unofficial) website. [http://www.svrsig.org/svr/Frame7.htm Link]. Accessed 05/01/2015.
* "Highley". Signal box profile on the Severn Valley Railway S&T Department (unofficial) website. [http://www.svrsig.org/svr/Frame6.htm Link]. Accessed 05/01/2015.
* "Hampton Loade Railway Station". Wikipedia article. [http://en.wikipedia.org/wiki/Hampton_Loade_railway_station Link]. Accessed 05/01/2015.
 
* "Hampton Loade Signal Box". Informational handout for signal box visits during a special event on 25/07/2004. Text transcribed by Dave Rowley, and available on his website. [http://www.fcet.staffs.ac.uk/dtr1/svr/stations/Hampton_Loade/signalbox-handout.html Link]. Accessed 05/01/2015.
1,980
edits

Navigation menu