Changes

Jump to: navigation, search

Hampton Loade

140 bytes removed, 18:45, 15 March 2015
House conversion is still in planning stage and not finally agreed yet!
During the early years of SVR operation (early 1970s) Hampton Loade formed the southern terminus. Evidence of this remains in the form of the presence of the down starting signal on platform 2, which is normally only used for up trains.
During periods of lighter traffic, when [[Hampton Loade signal box]] is switched out, all trains use platform 1, adjacent to the station house. In late 2014 the railway announced that as the station house had become vacant, it was to be converted into SVR volunteers' accommodation.
The crossing loop at Hampton Loade is the shortest on the railway, only able to hold a loco and 8 full-length coaches.
Trustworthy
32
edits

Navigation menu