Difference between revisions of "Hampton Loade"

From SVR Wiki
Jump to: navigation, search
Line 1: Line 1:
 
Hampton Loade station has two platforms and a [[Hampton Loade signal box|signal box]], allowing trains travelling in opposite directions to pass. The next stations in the Up direction towards [[Kidderminster]] is [[Country Park Halt]] and then [[Highley]], and the next station in the Down direction is [[Bridgnorth]], where the line terminates.
 
Hampton Loade station has two platforms and a [[Hampton Loade signal box|signal box]], allowing trains travelling in opposite directions to pass. The next stations in the Up direction towards [[Kidderminster]] is [[Country Park Halt]] and then [[Highley]], and the next station in the Down direction is [[Bridgnorth]], where the line terminates.
 +
 +
[http://www.sharpos-world.co.uk/cpg/thumbnails.php?album=17 Photos at Hampton Loade, showing station buildings, signalbox etc.]
  
 
== See Also ==
 
== See Also ==
  
 
[[List of stations]]
 
[[List of stations]]

Revision as of 13:54, 11 January 2015

Hampton Loade station has two platforms and a signal box, allowing trains travelling in opposite directions to pass. The next stations in the UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) direction towards Kidderminster is Country Park Halt and then Highley, and the next station in the DownIn reference to the direction of travel means away from the major terminus (i.e. towards Bridgnorth on the present day SVR) direction is Bridgnorth, where the line terminates.

Photos at Hampton Loade, showing station buildings, signalbox etc.

See Also

List of stations