GWR 66 Breakdown Tool Van

Revision as of 21:45, 8 March 2015 by Robin (talk | contribs) (typo)
GWR Breakdown Tool Van 66

Breakdown Tool Van 66 was built in 1921 and first allocated to Taunton.

It was acquired in 1985 by the The GWR 813 Preservation Fund, and is situated at Hampton Loade where it is used by The Barry Railway Carriage Trust as a sales vehicle.

Sources

Vintage Carriages Trust database
GWR 813 Preservation Fund

Links

See also