It was removed from regular use thereafter, variously ascribed to the platform edge becoming dangerous or due to the steep gradient, short platform, and low passenger numbers.<ref>[http://en.wikipedia.org/wiki/Eardington_Halt_railway_station Wikipedia]</ref>
Part of the cutting behind station collapsed January 1991.<ref>SVR News 100 pp.18 and 36, SVR News 101 p.31</ref>
Restoration by a "small group of Bridgnorth C&W volunteers" started in 1989<ref>SVR News 100 p.35, SVR News 127 p.45</ref> By summer 1990, Steve Downs was "unofficial stationmaster".<ref>SVR News 100, p.31</ref> It was gradually cosmetically restored by the Friends and occasionally opened to visitors on certain special events, albeit with trains not stopping, from the [[Step Back to the 1940s|War Weekend]] of 25/26 June 1994 onwards.<ref>SVR News 111 p.36</ref>
By 1989 platform coping at the southern end of the platform, adjacent to station building, had been removed after it collapsed. A shortened platform, 152 feet long, remained at northern end.<ref>SVR News 92 p.2, SVR News 100 p.35, SVR News 109 p.19, SVR News 122 p.44, SVR News 127 p.45, SVR News 192 p. 30</ref> The Friends held a fundraising appeal in 2014 to replace the missing part;<ref>SVRA Working Members Newsletter November 2014</ref> it was reported on 27 October 2016 that sufficient funds had been raised to purchase the required replacement GWR bricks.<ref>[https://twitter.com/Eardingtonstn/status/791730973977219072 Eardington Station Twitter Feed], retrieved 1 November 2016</ref>
A project commenced during the January 2018 winter shutdown involving the partial rebuilding of the platform face.<ref>[https://svrtrust.org.uk/downloads/Platform%202018%20web%20version-1.pdf 'Platform' magazine, 2018 Issue 4, p.5]</ref> Some 8000 engineering bricks recovered from the London – Bristol mainline and donated by Kier Construction have been used. These have been cleaned up by the Friends of Eardington Station over a period of time and provide a genuine connection to the GWR. The rebuild was undertaken by JSR Construction who are based less than a mile away from the station, thus keeping the work local.<ref>[https://www.svrlive.com/eardington-station SVRLive 'Eardington Station' 13 January 2018]</ref><ref>[https://www.svrlive.com/winter-works-2018 'SVRLive Winter Works 2018' 16 January 2018]</ref> Work was completed on 31 January 2019, giving the station a full length working platform of 300' - roughly 5 coaches - for the first time since 1984. The £41,000 project was aided by donations from the [[Severn Valley Railway Charitable Trust Ltd| Charitable Trust]] and [[Severn Valley Railway Company Limited| the Guarantee Company]] of £6,500 each, with the remainder being raised by the Friends. The project was completed on time and on budget. <ref>[https://www.svrlive.com/eardington-station SVR Live February 2019]</ref><ref>[https://www.shropshirestar.com/entertainment/bridgnorth-entertainment/2019/03/01/volunteers-on-severn-valley-railway-proud-to-unveil-new-platform/ Smith, R., 'Severn Valley Railway volunteers proud to unveil new platform', Shropshire Star, 1 March 2019] (Retrieved 3 March 2019)</ref> The rebuilt platform, which incidentally is longer than those at [[Highley]], Hampton Loade and Bridgnorth’s platform 2, can be seen in the main photograph taken during the 2018 Goods Gala. It greatly improved the appearance of the station and progressed its potential use on future gala events.