Changes

Jump to: navigation, search

Eardington

767 bytes added, 13:14, 5 December 2018
add reopening
A project funded by the Friends, [[Severn Valley Railway Charitable Trust Ltd| Charitable Trust]] and [[Severn Valley Railway Company Limited| the Guarantee Company]] commenced during the January 2018 winter shutdown involving the partial rebuilding of the platform face.<ref>[https://svrtrust.org.uk/downloads/Platform%202018%20web%20version-1.pdf 'Platform' magazine, 2018 Issue 4, p.5]</ref> The rebuilding of the platform improves greatly the appearance of the station and allows consideration to its possible use on gala events at some point in the future. Some 8000 engineering bricks recovered from the London – Bristol mainline and donated by Kier Construction have been used. These have been cleaned up by the Friends over a period of time and provide a genuine connection to the GWR. The rebuild was undertaken by JSR Construction who are based less than a mile away from the station, thus keeping the work local.<ref>[https://www.svrlive.com/eardington-station SVRLive 'Eardington Station' 13 January 2018]</ref><ref>[https://www.svrlive.com/winter-works-2018 'SVRLive Winter Works 2018' 16 January 2018]</ref>
 
===Proposed reopening===
In November 2018, FCFM Group, the owners of nearby Astbury Hall, submitted plans to Shropshire Council for development of the hall and grounds as a 'holiday venue'. The Design Statement states "The applicant has agreed to assist in financing of the reopening of Eardington Station and to take a direct link between Astbury Estate and the Severn Valley Railway."<ref>[https://www.shropshirestar.com/news/local-hubs/bridgnorth/2018/12/05/50m-plans-revealed-for-world-class-holiday-venue/ Article on the proposed reopening in the Shropshire Star]</ref><ref>[https://pa.shropshire.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=PHHELNTDHH500 Planning application for Astbury Hall on Shropshire Council web site]</ref>
==Eardington siding==

Navigation menu