Changes

Jump to: navigation, search

Diesel Locomotives

67 bytes added, 17:07, 16 October 2018
m
40106 now staying longer.
| [[Diesel Locomotives hired by the SVR | 37688]] || English Electric || 37 || Co-Co || D05 Preservation Ltd || British Railways || Arrived Jan 2018, expected to stay until June 2019<ref name ="MTL"/> See [[Diesel Locomotives hired by the SVR]]
|-
| [[Diesel Locomotives hired by the SVR|40106]] || English Electric || 40 || 1Co-Co1 || Class Forty Preservation Society || British Railways ||Operational. Arrived 2 August 2018 as part of a relationship with the Class Forty Preservation Society that will see one of their locos with the SVR for one season at least. It covers for 37688 which is still not yet able to operate vacuum braked coaches. 40106 will stay was to have stayed until approximately September 2018 at which point she will was to be swapped with steam heat fitted 40135; 40106 now has woking steam heat, and is staying longer.
|-
| [[BR Class 50 50007 Hercules | 50007 Hercules]] || English Electric || 50 || Co-Co || [[The Class 50 Alliance]] || English Electric Leasing: Leased to British Railways ||Operational. Arrived January 2017. Main line registered.
| [[BR Class 50 50026 Indomitable|50026 Indomitable]] || English Electric || 50 || Co-Co || Paul Spracklen || English Electric Leasing: Leased to British Railways ||Arrived January 2018 on a commercial basis to enable the owner to undertake some rectification work on the locomotive which involved use of the [[Diesel Depot|TMD]] facilities. The locomotive previously visited the SVR in 2010-11 for repair work and Summer 2014 for hire.<ref>[https://forum.svr-online.org.uk/viewtopic.php?t=1459&postdays=0&postorder=asc&start=30 SVR Forum thread] (Retrieved 4 February 2017)</ref>
|-
| [[Class 50 Alliance Limited | 50033 Glorious]] || English Electric || 50 || Co-Co || Tyseley Loco Works || English Electric Leasing: Leased to British Railways ||Leased by [[Class 50 Alliance Limited]]. Resident at Tyseley Loco Works, but moved to the SVR 2018 for contract works .
|-
|}
Trustworthy
22
edits

Navigation menu