SVR withdrew planning application for the proposed relocation of the turntable 19.12.18
*July 2018 a completion and hand-over was forecast for the third week in July.<ref>SVR News 201, p. 15</ref>. This was followed by a revised plan to open on 3 September. An announcement in September gave a date of end of 2018, with a formal opening in Spring 2019.<ref>SVR Forum, September 2018</ref>
* October 2018 the former ‘overflow’ parking field was closed for contractors to construct a carefully surfaced, illuminated 200-space visitor West car park and access/egress routes.
* December 2018 the contractors' site offices and associated buildings were removed from the station car park following the practical completion of the much delayed, as yet unopened, new station building. The toilets and new car park opened.On 19 December the planning application for the proposed relocation of the turntable was withdrawn.<ref>[https://pa.shropshire.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=PHW267TDHOM00 Shropshire Council 18/05183/FUL | Construction of locomotive turntable reclaimed from Bath Road Bristol and associated enabling works] (Retrieved 31 December 2018)</ref>
<gallery>
Trustworthy, administrator
6,745
edits