Changes

Jump to: navigation, search

Arley signal box

41 bytes added, 09:51, 21 December 2015
no edit summary
The current signal box was reconstructed from 1974 to 1976 approximately on the site of the original signal box, which had been demolished by SVR volunteers at a time when extension southwards from Hampton Loade seemed unlikely. The frame, which has 30 levers, is originally from Kidderminster Station signal box (not to be confused with the post-preservation Kidderminster Station signal box), supplemented by specialist parts from Severn Beach and Gelli Las (Mid Glamorgan)<ref>SVR News 100, "Twenty years of Severn Valley signalling", John Phillips</ref>. The box superstructure was moved by road from Yorton, on the LNWR route between Shrewsbury and Crewe, to Hay Bridge, from where it was moved by rail to Arley. The signal box was fully commissioned on April 10th 1976.
At present 23 levers are in use, with 6 spaces and one spare lever. The repeater for signal number 6, the only stop signal not visible from the box, originates from the Didcot Newbury & Southampton branch of the GWR. With the exception of the down home signals, which originate from Bewdley (see Bewdley North signal box) and the up distant, all signals at Arley are of late GWR/BR(W) steel tubular post and enamel metal arm type. Signal 23, on the up platform, was originally the up starting signal at Llangollen, and removed by SVR volunteers before preservation efforts commenced there.
== Operational Features ==
[[File:Arley box diagram.gif|800px]]
==Signalling controlled from the box==
 
With the exception of the down home signals, which originate from Bewdley (see Bewdley North signal box) and the up distant, all signals at Arley are of late GWR/BR(W) steel tubular post and enamel metal arm type. Signal 23, on the up platform, was originally the up starting signal at Llangollen, and removed by SVR volunteers before preservation efforts commenced there.
==Adderbury Signal Box==
Trustworthy
98
edits

Navigation menu