Changes

Jump to: navigation, search

Arley

3 bytes added, 20:54, 9 December 2018
clarification
*1862: Arley station opened with the rest of the Severn Valley Line on 1 February, but had only one platform and no facility for crossing trains. Control of train movements was by single needle telegraph only
*1883: A second platform was brought into use in June 1883. Installation of a signal box and interlocking of points and signals were completed around this time.
*1891: ‘Train staff and ticket’ working in conjunction with a single-needle block telegraph was introduced throughout the line, replacing the earlier simple telegraph working arrangements. Henceforth drivers could not enter a section without possession of a physical staff , or a paper ticket stating the staff would follow on a succeeding train. Those used at Arley were for Arley to [[Bewdley North signal box|Bewdley North]] (hexagonal staff, yellow ticket) and Arley to [[Hampton Loade]] (square staff, red ticket).
*1894: ‘Electric staff’ working replaced staff and ticket working. [[Highley]] also became a staff station, breaking the long section to Hampton Loade.
*1898: An [[The Severn Valley Railway under GWR/BR ownership#Accidents | accident]] occurred when a train overran signals when entering the station and was derailed.

Navigation menu