Changes

Jump to: navigation, search

2047 Warwickshire

1 byte removed, 21:38, 16 August 2016
Current status: update
===Current status===
The long awaited overhaul of 2047 began in with a move to Bridgnorth in November 2010. {{As of|2016|0708}} the overhaul is in progress at the [[Bridgnorth Loco Works]], although a number of components have been moved to [[Bewdley]] for work to be done there. Pictures of progress at both locations can be seen on the [http://wilt.jimdo.com/7d-mw2047-restoration-progress/ Warwickshire Industrial Locomotive Preservation Trust web site 2047 restoration page].
==Boiler lap joints==

Navigation menu