Changes

Jump to: navigation, search

2047 Warwickshire

3 bytes removed, 01:18, 19 March 2017
Current status: change "as of" for long term project to annual update
===Current status===
The long awaited overhaul of 2047 began in with a move to Bridgnorth in November 2010. {{As of|2016|112017}} the overhaul is in progress at the [[Bridgnorth Loco Works]], although a number of components have been moved to [[Bewdley]] for work to be done there. Pictures of progress at both locations can be seen on the [http://wilt.jimdo.com/7d-mw2047-restoration-progress/ Warwickshire Industrial Locomotive Preservation Trust web site 2047 restoration page].
==Boiler lap joints==

Navigation menu