August 3

Revision as of 17:21, 4 December 2021 by Graham Phillips 110 (talk | contribs) (1891)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

On August 3 in SVR history.

  • 1882 The GWR authorised the building of a second platform, passing loop and extra sidings at Arley, including a signal box.[1]
  • 1882 The GWR authorised the building of additional platform accommodation and sidings at Highley, including a signal box.[2]
  • 1882 The GWR authorised the building of a second platform and passing loop at Hampton Loade.[3]
  • 1891 The GWR arranged to attach passenger carriages to the 6:30pm goods train to Kidderminster for the benefit of people returning from Tenbury Foresters' Fete, the last regular passenger train being scheduled to depart at 4:56[4]
  • 1996 The SVR staged its first 'Sixties weekend'[5].

See also

On this day in SVR history

← August 2 - August 4 →

References