Changes

November 25

365 bytes added, 16:31, 23 November 2017
no edit summary
[[File:813_20161105.jpg|thumb|300px|right|GWR 813 (2016)]]On {{PAGENAME}} in SVR history.
*1956 The signal box, Down line and platform at [[Ironbridge]] were taken out of use by BR.<ref>[[Bibliography#Books|Mitchell ( Smith (2007)]] fig. 91.</ref>*[[Severn Valley Railway Timeline 1965-1969#1967 | 1967]] [[GWR 813 Saddle Tank|GWR 0-6-0PT 813]] arrived on the SVR from Backworth Colliery in Northumberland.<ref>SVR News 123</ref>*[[Severn Valley Railway Timeline 2000-2009#2000|2000]] A train hauled by 8F 48773 was in collision with a van on [[Level crossing at Hill Farm, Northwood Lane|Northwood Crossing]]. The SVR was later absolved of any blame.<ref>SVR News 134</ref>
==See also==
{{On this day see also}}
==References==
<references />
[[Category:On this day in November]]
Trustworthy, administrator
11,932
edits