Changes

Jump to: navigation, search

Acceptance Lever

203 bytes added, 11:19, 25 January 2015
no edit summary
A method of operating a single line railway without the use of tokens or staffs. It relies on the section being [[Track Circuit]]ed throughout. Acceptance Lever working is used over the [[Bewdley South signal box|Bewdley South]] to [[Kidderminster signal box|Kidderminster]] single line section. It was first brought into use on 21 November 1987.
Trustworthy, administrator
216
edits

Navigation menu