Changes

July 22

608 bytes added, 15:35, 22 July 2019
fallen tree / revised service
[[File:Footbridge outside Bridgnorth Station 20150411.jpg|thumb|300px|right|Hollybush Road Footbridge opened on 22 July 1994]]On {{PAGENAME}} in SVR history.
*[[Severn Valley Railway Timeline 1990-1999#19921994|19921994]] The new [[Bridgnorth#Footbridge outside Bridgnorth Station|footbridge outside Bridgnorth Station]] was opened to the public.<ref>SVR News 114</ref>*2001 The [[Hampton Loade|Hampton Loade Station]] Gala featured the SVR's first National Velocipede Rally<ref>SVR News 139</ref>.*2019 Due to a fallen tree on the line between [[Highley]] and [[Hampton Loade]], trains ran between [[Kidderminster]] and Highley only with a vintage bus service operating between [[Arley]] and Bridgnorth<ref>[https://www.svr.co.uk/NewsItem.aspx?a=890 SVR Website] (retrieved 22 July 2019)</ref>.
==See also==
{{On this day see also}}
==References==
<references />
[[Category:On this day in July]] 
Trustworthy, administrator
11,932
edits