Changes

Severn Valley Railway Timeline 2010-2019

570 bytes added, 13:57, 16 July 2018
2018
'''July 2018'''
:On 1 July, new cylinders were lifted & installed on [[2047|Manning Wardle 2047 'Warwickshire]].<ref>[https://wilt.jimdo.com/section-4-2018/ WILT 2047 2018 Restoration page]</ref>
:Prolonged hot and dry weather, coupled with lineside fires, caused an all-diesel timetable to be announced from 10 July.
:On 14 July, Warwickshire's original boiler, smokebox and saddle tank were lifted onto [[GWR 42343 Machinery Flat|Loriot N 42343]] by the [[Cowans Sheldon 30-ton steam crane RS 1087|30-ton steam crane]] in preparation for a planned move of the locomotive chassis and other components to Bewdley later in 2018.
<gallery>
BR_1087_30_20180714.jpg|Boiler lift in progress on 14 July
</gallery>
==Locomotives used==
Trustworthy, administrator
11,943
edits